Replacement of transformers and reconstruction of RZA ÀÒ- 5.6 at Zainsk Condensation Plant
During shutdowns of power units at Zainsk Condensation Plant, connected to collecting bars 220 kV, necessity arises to transfer capacity from bus 500 kV to buses 220 kV through auto transformer groups 5ÀÒ and 6ÀÒ. Such capacity transfer presently is limited by capacity of total winding ÀÒ5 (neutral). In situations alike the coverage of deficiency in the grids 220 and 110 kV is covered by loading the CHPP equipment in non- cost-efficient condensation regime.
Within one month of operation only through such regime the fuel over- burning reaches 20 m. rubles in money terms. Replacement of 5ÀÒ of capacity135 MVA with transformers of capacity 167 MVA and reconstruction of relay protection and automation allows to increase the overflow of capacity from bus 500 to bus 220 kV at Zai Condensation Plant and thus prevent the costly regimes and exclude fuel over- burning
Term of realization: 2002 - 2006
Project stages: 2002 - 2004 - design, order and facilities manufacturing.
2006 - mounting of transformers, current cables, microprocessor device cabinets RZA.
In 2006 the work completed.
|