For high figures of Tatarstan energy holding development promoting the economical growth and social well -being of Russian Federation and implementation of Program of President of Russian Federation for doubling the GDP by 2010, JSC "Tatenergo" was awarded the title Laureate of International Premium of 2006 with awarding the Diploma of the Leader of economical growth and golden figurine of Mercury.
Main page Production Investments and Innovations Investment Projects Reconstruction of water pre-treatment installation at Zainsk Condensation Plant water
Investments and Innovations
Research and Technical Policy
Program for Cost Management
Information Technologies
Capital Construction and Technical Refurbishment
Investment Projects
Environmental Policy
Investment Projects

Reconstruction of water pre-treatment installation at Zainsk Condensation Plant water.

There is no reserve of primary water, as because of absence of pre-cleaning the water pre-treatment installation cannot operate on the surface waters (Kama river water and water of Zainsk water basin). For enhancing the reliability of provision the power boilers with desalted water it is necessary to do reconstruction using as primary water the water from water storage basin, and as reserve the water from Kama river.

Considering increased corrosion and high mineralization (up to 1 g/dm3) of water storage basin, as well as for reduction of consumption of chemical reagents and number of drainage from VPU the following scheme of water pre-treatment reconstruction: mechanical grid filters – ultra filtration – return osmoses - final cleaning on existing filters Í – ÎÍ. Commissioning of return osmoses installation will save up to 37% o chemical regents.

Building with ultra-filtration and return osmoses installations Ultra-filtration installation
Building with ultra-filtration and return osmoses installationsUltra-filtration installation
Return osmoses installation Return osmoses installation
Return osmoses installationReturn osmoses installation

Term of realization:
2004 – 2006

Project stages:
2004 – reconstruction of water pre-cleaning and construction of ultra-filtration installation.
2005 – 2006 – reconstruction of desalting installation and replacement of I stage with return osmoses installation of 210 t/h capacity.

The work completed in 2006.