Installed electrical capacity of the power system as of 1.01.2008 was 6,975 MW. Of which figure the capacity of all of the CHP - 5,770 MW (82.72%), capacity of Nizhnekamsk Hydro Plant - 1,205 MW (17.28%). In accordance with the solution of the commission and technical acts of remarking the steam turbines: Kazan CHP-2 ÒG ¹ 7 ST-50-130/13 in ST-65/75-130/13 with installed capacity 65 ÌW, Kazan CHP-3 ÒG ¹ 2 R-35/50-130/13 in R-50-130/13 with installed capacity 50 ÌW, Nizhnekamsk CHP (PTK-1) ÒG ¹ 3, 8, 11 R-70/100-130/15 in R-100-130/15 with installed capacity of 100 ÌW each, and because of separating from JSC "Generation Company" of branch of Urussu Condensation Plant, in accordance with purchase-sale contract ¹ D 370/85 dd.,08.06.2007.
Structure of turbine equipment at the CHP is like follows: installed electrical capacity of condensation turbines 2,400 MW (12 blocks of Zainsk Condensation Plant ), cogeneration electrical capacity 3,370 ÌW (40 turbines) and GT - 2 units.
In structure of the cogeneration turbine equipment – the turbines of type Ò with heating extractions have the installed capacity 1,535 MW (14 units), cogeneration turbines of type PT with production and heating extractions of steam 950 MW (12 unit) cogeneration back pressure turbines of type R (PR) 835 MW (14 units). Installed peak capacity of the system is determined by the capacity of Nizhnekamsk Hydro Plant and constitutes 1,205 MW – 17.28%. Regarding the initial parameters of steam the structure of installed equipment is given in the Table.
| Pressure of direct steam, ata
| Electrical capacity, MW
| Electrical capacity, %
| Number of steam turbines
|
| 130 |
5,575 |
98.67 |
51 |
| 90 |
25 |
0.44 |
1 |
| GT |
50 |
0.89 |
2 |
Installed thermal capacity of the power system as of 1.01.2008 was 15,032 Gcal/h. Of them on CHP 13,410 Gcal/h - 89,2%. The thermal Installed capacity of hot-water boilers is 5,982 Gcal/h (46 boilers) – 39/8%, thermal capacity of turbine extraction in the system is 8,820 Gcal/h - 58.8%). Available capacity of the district heating extractions is , 3,266 Gcal/h – 37.03%,of cogeneration industrial extractions is 5,554 Gcal/h – 62.97%.
Number:
| Steam turbines: |
130 ata - 51 units |
| 90 ata - 5 units |
| GT | 2 units |
| Power-plant boilers: | 130 ata - 67 units |
| 90 ata - 4 units |
| 30 ata - 3 units |
| Hot-water boilers: | PTVM - 30 - 3 units |
| PTVM - 50 - 6 units |
| PTVM - 100 - 12 units |
| PTVM - 180 - 17 units |
| KGVM - 20 - 3 units |
| KGVM - 180 - 7 units |
| DGVM - 10-13 - 2 units |
| TKU - 13 - 2 units |
Kazan CO-GENERATION PLANT - 1 |
Installed capacity:
electrical - 220 MW,
thermal - 630 Gcal/h |
|
|
Kazan CO-GENERATION PLANT - 2 |
Installed capacity:
electrical - 175 MW,
thermal - 821 Gcal/h |
|
|
Kazan CO-GENERATION PLANT - 3 |
Installed capacity:
electrical - 405 MW,
thermal - 1897 Gcal/h
|
|
|
| Naberexhnye Chelny CO-GENERATION PLANT |
Installed capacity:
electrical - 1180 MW,
thermal - 4092 Gcal/h |
|
|
| Nizhnekamsk Co-Generation Plant |
Installed capacity (PTK - 1):
electrical - 850 MW,
thermal - 3,885 Gcal/h
|
Installed capacity (PTK - 2):
electrical - 420 MW,
thermal - 1,945 Gcal/h
|
|
|
| Yelabuga CO-GENERATION PLANT |
Installed capacity:
thermal capacity - 420 Gcal/h |
|
|
| Nizhnekamsk Hydro Plant |
Installed capacity:
electrical - 1205 MW
|
|
|
| Zainsk Condensation Plant |
Installed capacity:
electrical - 2400 MW,