Construction of heat line - bridge I Naberezhnye Chelny
To the aim of tariff reduction for heat for population of district ZYAB at Naberezhnye Chelny, that got heat from the number of quarter boiler houses, it was decided to construct the heat line - bridge from heat line of NCh CHPP - New Town till district ZYAB.
Heat line - bridge from existing heat lines till pumping pump station of district ZYAB of length 6.7 km was built and commissioned. This allowed to increase by 70 Gcal/h the thermal load of the CHPP. Increase of electricity generation on heat consumption allowed the NCh CHPP in IV quarter 2006 reduce the specific consumption of fuel for supply of electricity by 10.5 g/kWh.
Term of realization: 2005 - 2006
Project was completed in III quarter of 2006.
|